Documents
- The final machine working group report from the international scoping study of a future neutrino factory and super-beam facility. This formed the initial basis for the baseline for the IDS accelerator systems.
- David Neuffer, Recent Results on Muon Capture for a Neutrino Factory and Muon Collider, NFMCC-doc-520-v1 (2008). Improvements to the bunching and phase rotation portions of the front end. Also available from here.
- R. C. Fernow and J. C. Gallardo, Engineering parameter list for the Study 2a front-end, NFMCC-doc-521-v1 (2008). From the document: "Tables of components have been extracted from the ICOOL simulation files and are presented in a more 'engineer friendly' manner." This should match the ICOOL input files from the baseline. Also available from here.